Industrial
Port Klang Distribution Hub
A 36,000 m² distribution warehouse for a logistics park near the port: three 40 m portal spans erected bay by bay while the slab followed behind.
- Sector
- Industrial
- Location
- Port Klang, Selangor
- Year
- 2026
- Steel
- 1,240 tonnes
- Scope
- Three-span portal frame warehouse
- Client
- Logistics park developer
- Duration
- 26 weeks
- Services
- Structural steelwork
Overview
Our largest project to date. The developer needed the building weathertight in six months to meet a tenant's move-in date, so we split the frame into twelve erection zones and fabricated in the same order, delivering each zone just in time for the crane.
The rafters were spliced at the ridge on the ground and lifted in pairs by our 80-tonne crane. Cladding contractors started on the first span three weeks after the first column went up.
Finishes specified
Structural steel S355
Epoxy and polyurethane
Hot-dip galvanised
Gallery
-
Rafters going up on the third span -
The site from the opposite corner -
Steel delivered on our own flatbed