Industrial
Senai Electronics Plant Mezzanine
A 1,800 m² plant mezzanine above a new cleanroom, carrying air-handling units and ductwork, installed while the production floor below kept running.
- Sector
- Industrial
- Location
- Senai, Johor
- Year
- 2025
- Steel
- 210 tonnes
- Scope
- Plant mezzanine with stairs and edge protection
- Client
- Electronics manufacturer
- Duration
- 12 weeks
Overview
The mezzanine had to carry heavy air-handling units without vibration reaching the cleanroom ceiling below. We worked with the client's engineer on a stiffer beam layout and isolated the plant bases from the deck.
Every member was bolted, not welded, on site: no hot works and no dust in a live electronics plant. Two stairs and 300 m of edge protection complete the floor.
Finishes specified
Structural steel S355
Hot-dip galvanised
Epoxy and polyurethane
Gallery
-
Stair and handrails up to the plant deck -
The mezzanine from the opposite end -
Air-handling units on the finished deck