Teguh Fabrication
Request a quotation

Commercial

Bangsar South Link Bridge

A 28 m glazed truss bridge linking two office towers, assembled at ground level and lifted into place in a single Sunday-night lift.

Sector
Commercial
Location
Bangsar South, Kuala Lumpur
Year
2024
Steel
120 tonnes
Scope
Glazed truss bridge between two towers
Client
Mixed-use developer
Duration
18 weeks
Isometric render of a glazed steel truss bridge linking two office towers at an upper floor

Overview

We assembled and glazed the bridge on the podium below, then lifted it in one piece with a hired 400-tonne crane under a full road closure between midnight and 6am.

Sliding bearings at one end let the towers move independently, and the steel was fire-protected with an intumescent coating to the engineer's specification.

Finishes specified

  • Structural steel S355
  • Epoxy and polyurethane
  • The bridge in place between the towers
    The bridge in place between the towers
  • The towers from the other side
    The towers from the other side
  • Truss bracing behind the glazing
    Truss bracing behind the glazing